Novalyst.
Spoiler-aware compendium Sign in
Library/ This Inevitable Ruin
Reading position Whole book
Whole book
← The Compendium
Generic mechanic illustration for Nest Integrity
mechanic

Nest Integrity

Nest Tower's Integrity

System-tracked structural health of the Nest Tower, announced in warnings as it collapses toward zero.

Story so far

Warnings arrived in sequence as the Nest Tower took fire: integrity at 25% after Yarilo threw a building into it, then 10%, and finally 8% once Donut killed the last enemy tower shooting at them. With every mage either dead or trapped in The Ball of Flesh, the crawlers had no way to repair it, so the number only ever went down.

Role

The countdown clock on whether the crawlers' last tower survives the siege.

Relationships

Nest Tower — The structure it measures
Donut — Buys it time by killing the towers shooting at it
Sources — 3 recorded facts, by chapter
Chapter 83
  • The structural health rating of the Nest tower, falling from 97% to 74% under Larracos's tower barrage.
Chapter 84
  • The structural readout for the Nest, sitting at 45% as gale pulses keep landing on its wall.
Chapter 85
  • System-tracked structural health of the Nest Tower, announced in warnings as it collapses toward zero.
Character portrait