The South Carolina facility uses Donald’s bunker design, with prefabricated furnished floors and a cafeteria already serving workers.
A concrete ramp within a smaller tent leads into the South Carolina facility. The bunker follows Donald's Design, and most floors were furnished and prefabricated before being lowered into place. Its cafeteria is already serving workers.
A concrete ramp provides entrance beneath a smaller tent. The interior contains prefabricated, furnished floors and an operating cafeteria.
It is an equipped bunker built from Donald’s design.